Text us or call us on : 011 33 20 30 40

Account Login





Lost password?
Signup now
aql Telecoms

Click here to view aql's range of voice fax and Business Voice over IP telephony solutions.
Click Here...

Cabling, Fibre and Ductwork

service icon

Where your connectivity requirements are long term and short distance (such as linking two offices in a business park, or connectivity within a city centre, it's often cost effective to own and operate "dark fibre". This is essentially a dedicated duct carrying fibre between two premises.



Cost of ownership versus rented connectivity can, depending on usage, produce payback periods between 1 month and 5 years - please contact us to discuss in more detail.

Specifications

aql® work with several engineering contractors to arrange wayleave and to excavate and install. Our services can range from fibre-only, to a fully installed, managed interconnect.

Costs

Typically, as a guide, a fibre dig will cost around £200 per linear metre, therefore a 100m dig is approximately £20K. Compare this with an annual leased line cost of £5k for a 100mb/s bearer and a 4 year payback is achievable.

Advantages

An inter-site fibre connection can be run at gigabit or 10 gigabit speeds as required. In those instances where this level of connectivity is required, the payback period can be as low as 6 months.

Next steps

Please contact us to discuss your requirements and if necessary, we'll be glad to arrange a no-obligation survey as required.

Quick Links

Latest News


Charity begins at home: Leeds Community Foundation’s 100 Club event takes place at aql Leeds

The Leeds Community Foundation (LCF) brought their quarterly meeting of the 100 Club to the aql...

Read More

aql welcomes students from the University of Leeds

Academics, researchers and students from the University of Leeds School of Mechanical...

Read More

Adam's Leeds - aql's CEO is one of the faces of Leeds!

  The article summarises Adam's career history and favourite spots : A scientist and...

Read More

A social experiment: BCS event held at aql's conference auditorium

aql’s new 370-seat, city centre conference auditorium was the setting for the  BCS (the...

Read More

aql to host Datacentre Transformation Conference 2013

aql are to host the Datacentre Transformation Conference (DTC) on Tuesday 9 July 2013 in the new...

Read More